Sunday, September 15, 2019
Native American Culture Facts
SYNDICATE 7 } } Bottlenecks in the processing system at RP1 Excessive truck-waiting time and costs annoying the berry growers Excessive labour costs Poor berry grading system } } Wet Berries 58% System throughput rate : 1200 bbls/hr Wet Berries 70% System throughput rate : 1050 bbls/hr Wet Berries 70%, with a Dryer? System throughput rate : 1200 bbls/hr 3500 3000 2500 Berries (bbls) 2000 58% Wet Berries, 11am Start 70% Wet Berries, 11am Start 70% Wet Berries, 7am Start 1500 1000 70% Wet Berries, 7am Start, 1 Dryer 500 -8 8-9 9-10 10-11 11-12 12-13 13-14 14-15 15-16 16-17 17-18 18-19 19-20 20-21 21-22 22-23 23-00 00-1 1-2 2-3 3-4 4-5 5-6 6-7 7-8 8-9 Time (24-hour) 0 Options No. Of Hours Trucks wait No. Of barrels waiting in the truck (bbls) 1 Truck Capacity (bbls) Total truck waiting time (hrs. ) Average Truck waiting time (minutes) % Change in waiting time Cost per hour/per truck/per day Harvest season truck waiting cost (106 days) % Change in peak-season Truck waiting costs 58% Wet Berries -11am Start 12 hours 16000 75 213. 34 53 ââ¬â $ 100 2,260,980 ââ¬â 70% Wet Berries -11am Start 15 hours 40600 75 541. 34 135 Reference level $ 100 $ 5,738,204 Reference level 70% Wet Berries -7am Start 7 hours 9500 75 127 32 -76. 3% $ 100 $ 1,346,200 -76. 5% 70% Wet Berries -7am Start, with 1 Dryer 0 hours 0 75 0 0 -100% 75 0 -100% 5000 4500 4000 3500 Berries (bbls) 3000 2500 2000 1500 1000 500 0 Start 11am- 70% Wet Berries Start 7am- 70% Wet Berries, 1 Dryer Start 7am- 70% Wet Berries Start 11am- 58% Wet Berries 7-8 8-9 9-10 10-11 11-12 12-13 13-14 14-15 15-16 16-17 17-18 18-19 19-20 0-21 21-22 22-23 23-00 00-1 1-2 2-3 3-4 4-5 5-6 6-7 7-8 8-9 Time (24-hour) Savings: 70% Wet 11am Costs/ 70% Wet Berries, Berries, 11am Alternatives à 7am Start, 2 shifts start v/s Start, 1 shift 7am start 70% Wet Berries, 7am Start with 1 dryer, 2 shifts Savings: 7am start with 1 Dryer over 7 am start with no dryer Equipment Truck Waiting Labour Total Costs $ 0 $57,38,204 $5,66,645. 71 $63,04,849. 7 1 $ 0 $13,46,200 $5,13,948. 57 $18,60,148. 57 77% 9% 70% $ 60,000. 00 $ 0 $4,99,229. 71 $5,59,229. 71 100% 3% 70% }Start Operations at 7am with 2 work-shifts Truck waiting time reduces to 32min on average and costs by 76. 5% Labour costs decrease by 9% } Invest in One Dryer Truck waiting goes down to zero and thus no truck waiting costs Labour costs reduce a further 3% â⬠¢? Buy the Light Meter System Helps save $ 318,410 in the first season itself } Going forward, invest in increasing the capacity of the Drying system to 1200bbls/hr as proportion of wet berries increases. This will help avoid labour and truck waiting costs
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.